Skip to main content
Home
Water Research Laboratory
Search scope
  • Home
  • About us
    • Organisational chart
    • Quality assurance
    • Networks
      • Women @ WRL
      • WRL Green Team
  • Our team
    • Find a staff member
  • Research
    • Research project highlights
      • Australian coastal observation network
      • Big Swamp restoration project
      • Caseys Beach seawall upgrade
      • Clybucca Wetlands management options study
      • Coastal adaptation needs for extreme events and climate change, Avarua, Rarotonga, Cook Islands
      • CoastSnap
      • Eurobodalla Shire Council coastal hazard assessment
      • Hunter River water quality model
      • Hunter scoping study
      • Kingscliff seawall design
      • Manly coastal hazard assessment
      • Oceanlinx wave energy system physical modelling
      • Oyster reef restoration project
      • Peer review of Watermark Coal groundwater modelling report
      • Physical modelling of Bounty Bay breakwater, Pitcairn Island
      • Port Fairy coastal hazard assessment
      • Scrivener Dam physical model
      • Tomago Wetland restoration project
      • Tube fishway project
      • Tuckean Swamp drainage options study
      • Vehicle stability testing for flood flows
    • Publications
  • Facilities & equipment
    • 0.6 m wave flume
    • 0.9 m open channel flume
    • 1 m wave flume
    • 1.2 m wave flume
    • 3 m wave flume
    • Centrifuge permeameter
    • Chemistry laboratory
    • Coastal imaging
    • Groundwater field equipment
    • Numerical modelling
    • Soils laboratory
    • Spillway flume
    • Survey equipment
    • UAV/drone surveying
    • Wave basin
  • Expertise
    • Coastal engineering
    • Civil engineering hydraulics
    • EcoEng@WRL
    • Environmental engineering
    • Groundwater
    • Hydrology and water resources
    • Offshore renewable energy
  • Capabilities
    • Coastal engineering: Physical modelling
    • Local government solutions
    • Outfalls
    • Pacific climate change and disaster risk management
    • Wetland restoration
  • News
  • Videos
  • Contact us
  • Water Research Laboratory
  • Videos

Tags

Show All
UAV
drone
coastal storm
coastal erosion
storm damage
Wamberal
geotextile
Coastal Engineering
physical modelling
groyne
Manly Dam
art
Manly Dam Project
Coastal Imaging
coastal monitoring
machine learning
people counting
beach change
Surveying
Palm Beach
Thirlmere Lakes
hydrology
Storm
Seabees
Cronulla
East Coast Low
overtopping
Fairy Bower
Manly
3 m wave flume
Gold Coast
Kirra
geotube
Coolangatta
Greenmount
Screen Shot 2019-11-22 at 3.35.34 pm
1984 North Kirra geotube groyne testing

Water Research Laboratory

School of Civil and Environmental Engineering
UNSW Water Research Laboratory
110 King St, Manly Vale, NSW, 2093, Australia

Telephone +61 2 8071 9800

Quality System Certified to AS/NZS ISO 9001
Provider Code: 00098G ABN: 57 195 873 179

Join the conversation

     

Quick links

  • Site login
Authorised by the Director of UNSW Water Research Laboratory, Provider Code: 00098G, ABN: 57 195 873 179
 bsi ISO9001 Quality Management

Privacy Policy | Copyright & Disclaimer | Accessibility